Get a free quote
Asphalt Paving equipment and work at a commercial property

HALL COUNTY, GEORGIA

GAINESVILLE.
ASPHALT
PAVING.

Gainesville's development code spells out pavement thickness by street class down to the quarter-inch. We build to that spec on every job, residential or commercial.

LOCAL GROUND. A PLAN THAT FITS.

PAVEMENT STANDARDS.
LAYER BY LAYER.

Gainesville's Unified Land Development Code sets collector streets at 8 inches of graded aggregate base, local streets at 6 inches, with a 2.5-inch binder course and a 1.5-inch topping on top, 4 inches of total pavement. That's an unusually specific standard for a city this size.

An asphalt paving crew either builds to it or redoes the job when it fails inspection. We build to the actual spec the first time.

Asphalt paving work on a commercial property

BUILT AROUND YOUR PROPERTY

GAINESVILLE
ASPHALT PAVING.

Driveway paving and resurfacing

Plan the route, grade, base and drainage for reliable access to the property.

Parking lot paving

Build a prepared, durable surface for the traffic your property needs to handle.

Subdivision and collector street paving

Identify the trees that stay and plan equipment access around their protection zones.

Seal coating

Assess the existing asphalt and use polymer-modified sealer to protect the surface.

BUILT AROUND THE CONDITIONS

BETTER SEALER.
LONGER-LASTING PROTECTION.

We run a polymer-modified sealer rather than the coal-tar mix common in the trade. The cheap version looks fine going down and starts graying out in about four months.

Polymer-modified costs more per square foot going in, but it carries a one-year warranty against graying, and the honest pitch is doing it once and coming back in five years, rather than resealing every six to twelve months.

Asphalt surface, curb and drainage preparation

BEFORE THE WORK STARTS

COMMERCIAL ACCESS.
PLAN THE APPROVALS.

Gainesville requires deceleration lanes at entrances to subdivisions and commercial or industrial developments fronting arterial and collector streets, 12 feet wide with curb and gutter running at least 200 feet.

State approval and a GDOT driveway permit are a precondition of development permit approval on any site touching a state route. We account for both before the paving plan gets finalized rather than partway through.

PLAN THE WORK BEFORE IT STARTS

LOCAL GROWTH.
PAVING AT EVERY SCALE.

Hall County issued 1,846 new single-family permits in 2025 and carries roughly 2 million square feet of speculative industrial development across Gainesville, Oakwood, Flowery Branch and Buford. That mix means driveway and subdivision paving alongside large commercial lots, and we quote both scales the same way, from a single-home driveway to a multi-acre industrial site.

Completed asphalt access and parking at a commercial property

PLAN THE WHOLE JOB

FROM BASE TO SURFACE.
A COMPLETE PAVING PLAN.

Every job starts with a site walk and a real diagnosis of what’s wrong with the existing surface, ahead of any reseal quote. From there it’s tear-out and base work where the asphalt has failed, spot patching where it’s holding, and sealing to protect what’s left. Striping stays bundled inside a paving or resurfacing job rather than something we quote on its own.

Site assessment

Walk the property and diagnose the existing surface.

Base & repairs

Address failed asphalt and prepare the base before the surface.

Pave & protect

Complete the paving or sealing scope, including striping where specified.

HALL COUNTY, GEORGIA

YOUR NEXT CHAPTER.
RIGHT HERE.

Tell us where your Gainesville-area project is and what you’re planning. We’ll work through the asphalt paving scope with you.

We confirm the jurisdiction and the conditions that apply to your property before finalizing the work.

TELL US THE ADDRESS
SERVICE AREA MAP · HALL COUNTY, GEORGIA

YOUR GAINESVILLE QUESTIONS.
ANSWERED.

Start with the property and what you want to do. We’ll help you work through the details.

Collector streets call for 8 inches of graded aggregate base, local streets 6 inches, with a 2.5-inch binder and 1.5-inch topping for 4 inches of total pavement. We build to that standard on every job inside city limits.

We use a polymer-modified sealer rather than the coal-tar mix that grays out within months. It costs more going in but carries a one-year warranty and holds up for years, cutting the usual reseal cycle way down.

If it fronts an arterial or collector street, likely yes. Gainesville requires a 12-foot deceleration lane with curb and gutter for at least 200 feet at those entrances.

Yes. Hall County's industrial development runs into the millions of square feet, and we scale base depth and crew size to that load the same way we would a residential driveway.

It depends on the footprint, the street classification, and whether it's new paving, tear-out and replacement, or sealing. We walk the site and quote it in writing before work starts.

Striping stays bundled inside the paving or resurfacing jobs we complete, rather than something we quote on its own.

PLAN FOR TRAFFIC.BUILD BETTER PAVEMENT.

Tell us about your Gainesville property and how it is used so we can match the pavement, access and schedule to the job.

GET A FREE QUOTE
Call NowEmail