Get a free quote
Land Clearing & Grading equipment and work at a commercial property

HALL COUNTY, GEORGIA

GAINESVILLE.
LAND CLEARING
& GRADING.

Hall County exempts small residential clearing jobs from some paperwork. Commercial work carries full requirements at every size, in both jurisdictions.

LOCAL GROUND. A PLAN THAT FITS.

COMMERCIAL WORK.
FULL REQUIREMENTS.

Hall County's code states it directly: a noncommercial project under an acre skips the full land-disturbing permit's plan requirements, but commercial projects carry those requirements at every size. Inside Gainesville city limits, a land development permit applies to clearing, grubbing, grading and excavation at every acreage, aside from a narrow carve-out for detached single-family and duplex homes.

The exemptions that exist are built for small residential jobs; a commercial pad carries full requirements regardless of size, in both places.

Earthmoving equipment preparing a commercial building site

BUILT AROUND YOUR PROPERTY

GAINESVILLE
CLEARING & GRADING.

Residential lot clearing

Define the work area, retain the trees that belong and prepare for the next stage of the project.

Commercial and industrial pad grading

Match preparation, access and equipment to the scale and intended use of the site.

Subdivision grading

Prepare the ground and access around the approved development plan.

Tree protection compliance

Identify the trees that stay and plan equipment access around their protection zones.

BUILT AROUND THE CONDITIONS

PROTECTED TREES.
BEFORE THE FIRST CUT.

Gainesville caps tree removal at 90 percent of what's on a lot under its tree protection chapter, and an unauthorized specimen tree has to be replaced at twice its value, four times for a historic or landmark tree. Hall County requires a permit before touching any tree ten inches in diameter or larger inside a protection zone, and a development plan has to be approved before a lot can be cleared at all.

Both rules exist to stop exactly the move some crews try: clear first, file the paperwork after.

Erosion control and ground preparation on a commercial site

BEFORE THE WORK STARTS

WATERSHED BUFFERS.
KNOW THE BOUNDARY.

Property within seven miles of Gainesville's North Oconee River water intake carries a 100-foot stream buffer plus a 150-foot zone where impervious surface is prohibited; beyond seven miles those numbers drop to 50 feet and 75.

The detail that catches people: this buffer protects streams feeding a drinking-water reservoir, and by the city's own definition that excludes the multipurpose reservoirs the Army Corps of Engineers operates. Lake Lanier itself sits outside that 150-foot setback, unlike a smaller water-supply lake would carry. We check which rule applies to the actual waterway on the parcel rather than assuming the nearest one.

PLAN THE WORK BEFORE IT STARTS

POCKETS OF ROCK.
PLAN THE WHOLE SITE.

Pacolet and Madison together cover more than half of Hall County, both well-drained and mostly clear past 60 inches to bedrock. The exceptions sit in isolated pockets: Tallapoosa restricts at 15 inches, Musella at 17.

A lot can test clean on one corner and hit shallow rock a hundred feet away, which is why we walk the whole building envelope rather than pricing from a single test hole.

Prepared commercial ground with retained vegetation and site infrastructure

BEFORE THE WORK STARTS

GROWING DEMAND.
SITEWORK AT EVERY SCALE.

Hall County issued 1,846 new single-family permits in 2025, and roughly 2 million square feet of speculative industrial space is under development across Gainesville, Oakwood, Flowery Branch and Buford. New subdivisions are moving through approval right now: a 75-home project on Hog Mountain Road, a 326-home subdivision near the Hall line in Braselton, and a 45-lot development off Flat Creek Road.

This is a market with real volume on both the residential and commercial side, built on dozens of active projects rather than one or two.

PLAN THE WHOLE JOB

CLEARING COSTS.
A CLEAR START.

Land clearing runs by the acre once we've walked it. Burning what comes down starts at $10,000 per acre; grinding with the mulch left on site runs about $13,500 per acre, or about $16,000 per acre if we haul the chips off. Commercial and subdivision-scale grading prices separately once we know the acreage, the cut and fill, and which jurisdiction's tree and buffer rules apply.

Burn on site

From $10,000 / acre

Clearing with on-site burning, where permitted.

Grind & leave mulch

About $13,500 / acre

Grinding with the mulch remaining on the property.

Grind & haul off

About $16,000 / acre

Grinding with the chips removed from the site.

HALL COUNTY, GEORGIA

YOUR NEXT CHAPTER.
RIGHT HERE.

Tell us where your Gainesville-area project is and what you’re planning. We’ll work through the land clearing & grading scope with you.

We confirm the jurisdiction and the conditions that apply to your property before finalizing the work.

TELL US THE ADDRESS
SERVICE AREA MAP · HALL COUNTY, GEORGIA

YOUR GAINESVILLE QUESTIONS.
ANSWERED.

Start with the property and what you want to do. We’ll help you work through the details.

It carries full requirements regardless of size. Hall County exempts small noncommercial projects from some plan requirements, but commercial work carries full requirements at every size. Inside Gainesville city limits, the permit applies at every acreage outside the single-family and duplex carve-out.

In unincorporated Hall County, a plan has to be approved before a lot can be cleared. Gainesville caps total tree removal at 90 percent regardless of timing. We sequence permitting and clearing to match both rules.

Within seven miles of the North Oconee intake, a 100-foot buffer plus a 150-foot zone where impervious surface is prohibited. Beyond seven miles, 50 feet and 75. Lake Lanier itself sits outside the reservoir version of this rule.

Hall County carries zero trout stream designations. The governing state buffer here is 25 feet, and the local 50-foot buffer already exceeds that figure on its own, independent of any trout classification.

It runs by the acre. Burning starts at $10,000 per acre; grinding runs about $13,500 per acre with the mulch left on site, or about $16,000 per acre hauled off. We walk the site before quoting final price.

Rarely. Pacolet and Madison, the two most common soils, run more than 60 inches to bedrock. Pockets of shallow rock exist, as little as 15 inches down in spots, so we test across the whole lot rather than one corner.

Yes. Hall County's permit volume runs heavy on both sides, and we quote everything from a single homesite to a multi-lot subdivision or industrial pad.

We confirm jurisdiction against the parcel line before filing. Gainesville and Hall County administer separate permits with different acreage rules, and getting the wrong one delays the job.

GET YOUR NEXTDEVELOPMENT STARTED.

Send your Gainesville or Hall County plans so we can confirm the jurisdiction and prepare a clearing and grading scope for your site.

GET A FREE QUOTE
Call NowEmail