Get a free quote
Asphalt Paving equipment and work at a commercial property

PICKENS COUNTY, GEORGIA

JASPER.
ASPHALT
PAVING.

Pickens County caps road grade at 16 percent across every residential road class, roughly double what flatter counties allow. Paving here starts with grading to that number.

LOCAL GROUND. A PLAN THAT FITS.

DRIVEWAY GRADES.
BUILT TO THE STANDARD.

Pickens County's subdivision road standard caps grade at 16 percent on residential rural roads, residential suburban roads and collector streets alike, each with its own base and surface spec: 6 inches of base and a 1.25 to 1.5-inch top on residential roads, 8 inches of base on collectors. Back slopes run at least 1.5 to 1 and fill slopes at least 2 to 1.

On mountain lots, that grade cap decides how a driveway gets routed before asphalt paving ever starts.

Asphalt paving work on a commercial property

BUILT AROUND YOUR PROPERTY

JASPER
ASPHALT PAVING.

Driveway paving and resurfacing

Plan the route, grade, base and drainage for reliable access to the property.

Mountain and steep-lot driveway paving

Route the drive around the grade change and switchbacks a mountain lot adds.

Parking lot paving

Build a prepared, durable surface for the traffic your property needs to handle.

Seal coating

Assess the existing asphalt and use polymer-modified sealer to protect the surface.

BUILT AROUND THE CONDITIONS

BETTER SEALER.
LONGER-LASTING PROTECTION.

We run a polymer-modified sealer rather than the coal-tar mix common in the trade. The cheap version looks fine going down and starts graying out in about four months.

Polymer-modified costs more per square foot going in, but it carries a one-year warranty against graying, and the honest pitch is doing it once and coming back in five years, rather than resealing every six to twelve months.

Asphalt surface, curb and drainage preparation

PLAN THE WORK BEFORE IT STARTS

CULVERTS AND RUNOFF.
DRAINAGE COMES FIRST.

Pickens County requires drainage pipe at least 15 inches in diameter and 20 feet long under any access point, with the discharge end stabilized in rip-rap for a distance of eight times the pipe’s diameter.

On steep ground, undersizing a culvert shows up fast the first heavy rain after paving, so we size to the county standard rather than the minimum that happens to fit.

Completed asphalt access and parking at a commercial property

PLAN THE WHOLE JOB

FROM BASE TO SURFACE.
A COMPLETE PAVING PLAN.

Every job starts with a site walk and a real diagnosis of what’s wrong with the existing surface, ahead of any reseal quote. From there it’s tear-out and base work where the asphalt has failed, spot patching where it’s holding, and sealing to protect what’s left. Striping stays bundled inside a paving or resurfacing job rather than something we quote on its own.

Site assessment

Walk the property and diagnose the existing surface.

Base & repairs

Address failed asphalt and prepare the base before the surface.

Pave & protect

Complete the paving or sealing scope, including striping where specified.

PICKENS COUNTY, GEORGIA

YOUR NEXT CHAPTER.
RIGHT HERE.

Tell us where your Jasper-area project is and what you’re planning. We’ll work through the asphalt paving scope with you.

We confirm the jurisdiction and the conditions that apply to your property before finalizing the work.

TELL US THE ADDRESS
SERVICE AREA MAP · PICKENS COUNTY, GEORGIA

YOUR JASPER QUESTIONS.
ANSWERED.

Start with the property and what you want to do. We’ll help you work through the details.

The county caps grade at 16 percent across residential rural, residential suburban and collector road classes alike, about double what flatter counties allow. We grade and base to that standard on every job.

We use a polymer-modified sealer rather than the coal-tar mix that grays out within months. It costs more going in but carries a one-year warranty and holds up for years, cutting the usual reseal cycle way down.

Pickens County requires at least a 15-inch diameter pipe, 20 feet long, with rip-rap stabilization at the outlet. We size to that standard rather than the smallest pipe that happens to fit.

Yes. Grading to the county's 16 percent cap and building the base to handle runoff on steep ground is routine work for us here.

It depends on the footprint, the grade, and whether it's new paving, tear-out and replacement, or sealing. We walk the site and quote it in writing before work starts.

Striping stays bundled inside the paving or resurfacing jobs we complete, rather than something we quote on its own.

DRAINAGE FIRST.PAVEMENT THAT LASTS.

Send your Jasper paving plans so we can assess the grade, culverts and base before quoting a surface built for the site.

GET A FREE QUOTE
Call NowEmail